Thursday, March 27, 2014
Extreme Home MakeOver Continues...Getting Better
Here's a look at the outside before the roof was fully on...we take pictures but it they are always on different camera devices...and so getting them loaded onto this blog is seeming to be problematic.
We are still waiting for the 'back porch' or mudroom to get framed in. Getting everything to code in that area has been a challenge....and rebuilding isn't going well due to the fact that they can't get the post out of the ground that has the electrical box so that a new foundation can be poured...or something of the sort.
The hole in the second floor was for the trestles to go up. Glad I didn't have to haul them up. It was left for the drywall to make its way upstairs. Once again, glad I don't have to haul it up the stairs.
It is coming along. Weatherbys was out this week working on the plumbing. The electric guy spent a bit of time marking where the wires were going to be going. It is making progress.
Jut spent some time talking to the contractor today. If everything goes smoothly, we might be in by the end of May. However, the way the weather is working with us, the end of June seems more probable.
When I get the other camera out, I'll post some pics of the inside.